Axis draws back from coal and oil sands underwriting
  • X
  • LinkedIn
  • Show more sharing options
  • Print
  • X
  • LinkedIn

© 2024 Insider International Limited, company number 15236286, 4 Bouverie Street, London, EC4Y 8AX. Part of the Delinian Group. All rights reserved.


Accessibility | Terms of Use | Privacy Policy | Modern Slavery Statement

Axis draws back from coal and oil sands underwriting

coal-fired-power-plant-istock.jpg

Axis Capital is stop writing new primary or facultative cover for the construction of thermal coal plants or mines and their infrastructure.

Request a free trial:

Fuel a smarter strategy with our actionable market intelligence

    • Gain a competitive edge and accelerate decision-making
    • Be empowered by insights that transform confusion to clarity
    • Uncover growth opportunities and prepare for potential threats
Gift this article